Siemens 9200 specifications Wiring the 480V Power Supply, Powering Up the Meter

Page 4

Wiring the 480V Power Supply

9200 Power Supply Retrofit Instructions

 

 

Wiring the 480V Power Supply

Use18 to 14 AWG

(0.8mm2 to 2.1mm2) wire

Use18 to 14 AWG (0.8mm2 to 2.1mm2) wires

Connections to the L1 and L2 terminals can come from V1 and V2

100 mA fuses on L1 and L2

480V Power Supply

Connect one phase to the L1 terminal and the other phase to the L2 terminal. You can use the same wires from the grid that the voltage inputs use (see diagram above).

The power supply G (ground) terminal must be connected to the same point as the meterterminal.

Protective Fuses

The 480V power supply requires 100 mA fuses on the L1 and L2 terminals. These should be IEC type T slow blow fuses.

NOTE

100 mA fuses can be shared with the voltage inputs.

Powering Up the Meter

After the power supply is attached to the meter, and its wiring is connected:

1.Reconnect and energize all wiring that was disconnected when the meter was prepared for power supply installation.

2.Power up the meter and verify correct operation.

Page 4

Image 4
Contents Power Supply Replacing the Power Supply Plugging in the Power SupplyWiring the Power Supply Wiring the Standard AC/DC or Low Voltage DC Power SupplyWiring the 480V Power Supply Powering Up the MeterSpecifications