GENERAL PRECAUTIONS REGARDING THE SERVICE FOR
The installation and service shall be done by a qualified service technician.
1)Transportation/Installation
-When transporting/installing the equipment, employ four persons and be sure to hold the posi- tions as shown in the figure.
The equipment is quite heavy and weighs approximately 120 kg (264.55 lb.), therefore pay full attention when handling it.
- When transporting/installing the equipment, employ two persons and be sure to hold the posi- tions as shown in the figure. The equipment is quite heavy, and
-When transporting/installing the equipment, employ four persons and be sure to move it by the casters while lifting the stoppers. The equipment is quite heavy and weighs approximately 245 kg (540.12 lb), therefore pay full attention when handling it.
-When transporting/installing the equipment, employ four persons and be sure to move it by the casters while lifting the stoppers. The equipment is quite heavy and weighs approximately 202 kg (445.33 lb), therefore pay full attention when handling it.
-Be sure not to hold the movable parts or units (e.g. the control panel, ADU or RADF) when trans- porting the equipment.
-Be sure to use a dedicated outlet with AC 110 V / 13.2 A, 115 V or 127 V / 12 A,
-The equipment must be grounded for safety.
11/12