APC CTEP0-120 user manual Ground Mount Installation

Page 6

CTEP6 Model

 

 

 

 

 

Top Hole

Mounting Bracket

 

 

 

 

 

 

 

 

 

 

 

 

.75” (2 cm)

 

 

 

 

is permanently

 

12” (30 cm)

 

 

 

 

attached to

 

 

 

 

 

enclosure.

 

 

 

 

 

Middle Hole

 

12” (30 cm)

 

.75” (2 cm)

 

 

 

Bottom Hole

 

 

 

 

 

 

 

 

 

 

 

 

 

.75” (2 cm)

 

5/8” Pole

 

 

 

 

 

 

 

 

 

 

 

 

Bottom Edge of Housing

Bolt and

 

 

 

 

 

 

Square

 

 

 

 

 

 

Ground Mount Installation

Washer

 

1.Install an APC approved concrete pad. Contact your dealer or see How to Contact APC, in this manual for more information.

2.Secure the enclosure to the pad.

0 Battery Enclosure:

Attach the ground skirt to the concrete pad.

3 Battery, 6 Battery Enclosures:

Place the enclosure on the pad. The holes on the enclosure must be aligned with the anchor hooks on the pad, (hardware not included).

This is a general representation of an enclosure mounted on a pad. Configurations may vary.

Attach the enclosure to the ground skirt.

 

Service Entrance/

Meter Base

Load Center

Coax Housing

Coax Housing

 

4

Image 6
Contents BroadBand CTEP/G Series Page General Information SafetyElectrical Warnings Battery Warnings Overhead Warnings LiftingEnvironmental Specifications InstallationSpecifications Physical SpecificationsInstalling the Enclosure Pole Mount InstallationUnpacking Ground Mount Installation Wiring EP3EP0 Connecting the Batteries OptionsCTEP3 CTEP6 Service, Contact and Warranty Information ServiceHow to Contact APC Limited Warranty Regulatory Approval