2 | Patch Release Note |
Features in 86222-06
Patch
PCR: 01188 | Module: SWI | Network affecting: No |
The power supply voltages of the base board PHYs on a Rapier G6 are controlled by a PHY register value, which was incorrectly set. This issue has been resolved.
PCR: 01190 | Module: PIM | Network affecting: No |
In PIM Dense Mode, if a data stream started before PIM hello messages were exchanged, the receiver did not get the data stream. This issue has been resolved.
PCR: 01192 | Module: SWI | Network affecting: No |
The Rapier G6 base ports sometimes experienced spurious link up or link down events. This issue has been resolved.
Features in
Patch file details for Patch 86222-05 are listed in Table 2.
Table 2: Patch file details for Patch
Base Software Release File | |
|
|
Patch Release Date | |
|
|
Compressed Patch File Name | |
|
|
Compressed Patch File Size | 223728 bytes |
|
|
Patch
PCR: 01148 | Module: SWI | Network affecting: No |
A39 copper uplink modules in the Rapier G6 sometimes experienced spurious link up or link down events. This issue has been resolved.
PCR: 01157 | Module: CORE | Network affecting: No |
The enterprise MIB now supports objects for power supply monitoring.
PCR: 01162 | Module: PKI | Network affecting: No |
Certificates containing GeneralisedTime with the year in YYYY format are now parsed correctly. The keyUsage field of certificates is now parsed correctly when only one byte has been specified. The CRL update time is now displayed correctly in hours. If the username and password parameters are present the location parameter must be present and appear before the username and password parameters. Certificates with signatures of 257 bytes are now correctly parsed. Certificates added from a configuration script are now processed correctly.
Patch