Polycom LX100 manual Server Precautions

Page 6

POLYCOM READIMANAGER LX100 GETTING STARTED GUIDE

In multiple rack installations, the racks should be coupled together.

Always make sure the rack is stable before extending a component from the rack.

You should extend only one component at a time - extending two or more simultaneously may cause the rack to become unstable.

Server Precautions

Before you install the rails, determine the placement of each component in the rack.

Install the heaviest server components on the bottom of the rack first, and then work up.

Use a regulating uninterruptible power supply (UPS) to protect the server from power surges, voltage spikes and to keep your system operating in case of a power failure.

Allow the power supply units to cool before touching them.

Always keep the rack's front door and all panels and components on the servers closed when not servicing to maintain proper cooling.

4

Image 6
Contents Polycom ReadiManager LX100 Getting Started Guide Trademark Information Contents Overview Using This GuideContents of this Package Unpacking the UnitElectrical Safety Precautions System SafetyGeneral Safety Precautions Rack Mount Safety PrecautionsServer Precautions Product Information Front PanelRear Panel Enabling Remote AccessConfiguring the Unit to Connect to the Network Required ComponentsTo connect the unit Polycom Readimanager LX100 Getting Started Guide Logging onto Polycom ReadiManager LX100 ReadiManager LX100 HomeNext Steps Polycom, Inc Configuring Network Connections for the PC To set ActiveX control settings Other Setup TasksSetting Up Your Browser Allowing ActiveX controlsPolycom Readimanager LX100 Getting Started Guide Polycom, Inc Physical SpecificationsElectrical EnvironmentalWarranty Legal NoticesLicense Restrictions 1725-18006-001 Rev. a