Chauvet Q-ScanTM 250, Q-RollTM 250 user manual Setup, Lamp, Lam p In stall at ion

Page 6

SETUP

Lamp

 

You will need to install a lamp prior to the initial operation of the fixture. An MSD250 high intensity

 

discharge lamp is included.

Warning!

When replacing the lamp, please wait 15 minutes after powering down to allow the

 

unit to cool down! Always disconnect from main power prior to lamp replacement.

 

Do not touch the envelope (glass area) of the bulb with bare hands. If this happens, clean the lamp

 

with alcohol and wipe it with a lint free cloth before installation.

Lam p In stall at ion

1.Remove screws labeled (S1) and pull out lamp socket plate.

2.If replacing the lamp, remove old lamp first.

3.Holding the new lamp by its base, align the pins on the lamp with the small hole in the socket and insert the lamp squarely until the retaining clips on the lamp socket secure the lamp tightly.

4.Clean the glass/envelope of the bulb with an alcohol wipe or equivalent.

5.Holding the lamp socket plate, insert the tip of the lamp into the fixture with extreme care. Navigate the lamp all the way until it reaches the reflector and the lamp base plate touches the bottom plate of the fixture.

6.Align the screw holes and fasten the screws back onto the lamp socket plate.

7.If you are replacing the lamp, you may want to log the fixture hours in order to track the lamps use. Navigate to the H000 on the menu display to obtain this information. Please note that it is normal for the fixture to have logged a few hours of testing prior to your use.

S1

S2

S1

8.Turn the fixture on and adjust the lamp alignment screws (S2)

until the brightest most even area of the beam is in the center of your spot. It may be necessary for you to use a controller in order to command the fixture to display a white beam on a flat surface with no colors.

Maximizing the life of your lamp

To ensure the longest and most efficient use of the lamp always wait between 10 and 15 minutes before re-applying power after a shutdown.

Failure to do so could result in premature aging of the lamp and failure to the electronics that drive it.

Q-Scan 250 & Q-Roll 250 User Manual

6

2005-11-15/13:24

Image 6
Contents Scan Table of Content Before YOU Begin AC PowerSafety Instructions Is includedTechnical Features IntroductionDMX Channel Summary Product Overview Control BoardSetup LampLam p In stall at ion Power Exchanging gobosPow er Cabl e Conf igu ratio n Warnin g MountingOri ent at ion Rigg ingControl Panel Functions Operating InstructionsControl Panel Applying changes to Functions Quick InstructionsSetti ng Slav e F i xtu res Operating ModesAster & St and Al on e P6 Sou nd act ive P4 o r Au to run P5Daisy Ch ai n Conn ecti on Menu FunctionsDM X M ode Setti ng t he start ing addressP1 Pan I nvert / P2 T ilt I nvert P8 D ispl ay I nvertP3 Fi xtu re R eset al l m oto rs Appendix DMX PrimerFixtu re Li nking DMX Channel Values 16 Bit Shutter/Strobe/DimmerMaintenance Returns ProcedureClaims General Troubleshooting Technical Specifications Technical Support