PACKAGE CONTENTS
■Speaker x 1
■Speaker frame x 1
■Speaker grille x 1
■Speaker bracket x 1
■Wings for new construction x 2
■#6 x
■Speaker cutout template x 1
PREPARING FOR
INSTALLATION
If you are installing LST speakers into an existing wall, take time to consider any possible obstructions, which may be hidden inside the wall: studs, electrical wiring, telephone wiring, plumbing, AC or heating conduit and ductwork.
Determine the best mounting locations based on the room layout. Before cutting any holes, make sure the area behind both speakers is clear for installation. Speakers provide the best coverage, when centered in the wall. Choose a suitable mounting height, and then line up both speakers approximately the same distance from the sidewall and ceiling boundaries.
If you are installing the speakers into a new construction wall, follow the above recommendations and install the new construction speaker bracket.
Label the speakers wires at the amplifier location.
2
TOOLS REQUIRED
■Stud Locator (for existing construction)
■Drywall saw (for existing construction)
■Pencil (for existing construction)
■Cordless screwdriver with No2 Philips bit
■1/8” Slotted screwdriver x 2
■Wire stripper
■Wire labels
INSTALLATION
Installation Existing
Construction:
1.Using your stud locator, identify the location of the studs on each side of the proposed speaker mounting location.
2.Mark their edges, using masking tape.
3.Repeat this process for the other speakers.
4.You may have to adjust the speaker mounting locations based on how symmetrical the studs are located, in the wall space.
5.Check for clearance using the following method.
a.Drill a 1/4” pilot hole in the center of the intended speaker location.
b.Cut a
c.Bend the wire, creating a right angle, leaving
d.Poke the
e.Push it into the wall cavity to make sure you have approximately 4” of depth.
f.If the coat hanger movement is obstructed by anything, fill the hole(s) with spackle and try another location