JobSite Systems LSC-5/5R manual Package Contents, Preparing for Installation, Tools Required

Page 4

PACKAGE CONTENTS

Speakers x 2

Speaker grilles x 2

Speaker cutout template / paint mask x 1

PREPARING FOR

INSTALLATION

If you are installing the LSC-5/LSC-5R into an existing ceiling, take time to consider any possible obstructions which may be hidden inside the ceiling: ceiling joists, electrical wiring, telephone wiring, plumbing, AC or heating conduit and ductwork.

Determine the best mounting locations based on the room layout. Before cutting any holes, make sure the area behind both speakers is clear for installation. Speakers provide the best coverage, when centered in the room. Line up the speakers with a permanently mounted ceiling fixture such as can lights, or a light fixture.

If you are installing the speakers into a new ceiling follow the above recommendations and install a set of JobSite NCB-5 Ceiling Brackets, prior to drywall installation.

Run speaker wire from each location to the amplifier location. Label the speakers wires at the amplifier end, so you know which wire goes to each speaker.

TOOLS REQUIRED

Stud Locator (for existing construction)

Drywall saw (for existing construction)

Pencil (for existing construction)

Cordless screwdriver with No2 Philips bit

Wire stripper

Wire labels

INSTALLATION

Installation Existing

Construction:

1.Use a stud locator to identify the location of the ceiling joists on each side of the proposed loudspeaker mounting location.

2.Mark ceiling joists’ edges, using masking tape.

3.Repeat this process for the other loudspeaker locations.

4.You may have to adjust the loudspeaker mounting locations based on how the ceiling joists line up with the proposed speaker mounting locations.

5.Check for clearance using the following method:

a.Drill a 1/4” pilot hole in the center of the intended speaker location.

b.Cut a foot-long piece of coat hanger.

c.Bend the wire, creating a right angle, leaving 4-1/4” at one end.

d.Poke the “L-shaped” wire into the pilot hole and turn it in a complete circle, checking for obstructions.

e.Push it up into the ceiling cavity to make sure you have approximately 4” of depth.

f.If the coat hanger’s movement is obstructed by anything, fill the hole(s) with spackle and try another location.

6.Locate the hole template and remove the inside portion of it. The inside portion can be used as a paint mask, if you are painting the frame of the loudspeaker.

7.Use a pencil and hole template to trace the hole outline in the desired location on the ceiling.

8.Use a drywall saw to cut along the penciled line.

2

Image 4
Contents LSC-5/5R Table of Contents LSC-5 / 5RInstallation friendly design FeaturesProduct Overview Package Contents Preparing for InstallationInstallation Existing Construction Tools RequiredInstallation New Construction Removing the GrillesSpecifications OperationLimited Warranty

LSC-5/5R specifications

JobSite Systems has developed an innovative solution in the realm of construction and logistics management with its LSC-5/5R model. This advanced system is designed to streamline operations on job sites, enhancing efficiency while ensuring reliable and precise performance. The LSC-5/5R model incorporates a plethora of features, technologies, and characteristics that make it a formidable asset in the construction industry.

One of the standout features of the LSC-5/5R is its robust construction. Built to withstand harsh job site conditions, this system is both weather-resistant and durable. Equipped with high-quality materials, it ensures longevity despite exposure to the rigors of construction environments. The LSC-5/5R has also been designed with user-friendliness in mind, featuring an intuitive interface that allows operators to quickly learn and master the system.

Another significant aspect of the LSC-5/5R is its advanced technology. At the core of the system is a powerful GPS module that allows for precise location tracking. This technology facilitates real-time monitoring of equipment and materials, which is vital for maintaining workflow and reducing downtime. The system can integrate seamlessly with management software, providing an efficient platform for data sharing and communication among team members.

The LSC-5/5R also boasts a flexible configuration that adapts to different project requirements. It can be scaled to manage various volumes of materials, making it suitable for both small projects and large-scale construction undertakings. Additionally, the unit features a battery life that supports extended work hours, reducing the need for frequent recharging and keeping operations constant.

Safety is another priority in the design of the LSC-5/5R. The system incorporates various safety features, including overload sensors and emergency shut-off mechanisms. These elements work together to minimize risks and ensure compliance with safety regulations on job sites.

In conclusion, the JobSite Systems LSC-5/5R is a cutting-edge solution that combines durability, advanced technology, and user-friendly design. Its capabilities in real-time tracking, flexibility in operation, and commitment to safety make it a valuable tool in the construction industry. As projects grow increasingly complex, the LSC-5/5R stands out as an essential component in facilitating efficient and organized job site management.