JobSite Systems LSC-5/5R manual Installation New Construction, Removing the Grilles

Page 5

9.Strip 1/4" of insulation from the end of each wire coming from the amplifier.

10.Tightly twist the end of each wire until no frayed ends remain.

11.Attach the speaker wires to the speaker terminal connectors. Connect the negative output from the amplifier to the black terminal and the positive output to the red terminal.

12.There are four clamps “dogs” which hold each speaker in place. Rotate all the dogs inward.

13.Insert the loudspeaker into the cutout in the ceiling.

14.The dogs are tightened via four front-baffle screws. Tighten the dogs by turning the screws clockwise, while pressing the loudspeaker against the ceiling. NOTE: DO NOT OVER TIGHTEN THESE SCREWS. Over- tightening the screws may make the grille difficult to install.

15.Install the grille into the speaker.

16.Repeat this procedure for the next speaker.

Installation New Construction:

Install the proper ceiling bracket for this loudspeaker (NCB-5) using the instructions supplied with the bracket. After the hole is cut in the drywall per the bracket instructions, perform the following steps:

1.Strip 1/4" of insulation from the end of each wire coming from the amplifier.

2.Tightly twist the end of each wire until no frayed ends remain.

3.Attach the speaker wires to the speaker terminal connectors. Connect the negative output from the amplifier to the black terminal and the positive output from the amplifier to the red terminal.

4.There are four clamps “dogs” which hold each speaker in place. Rotate all the dogs inward.

5.Insert the loudspeaker into the cutout in the ceiling.

6.The dogs are tightened via four front-baffle screws. Tighten the dogs by turning the screws clockwise, while pressing the loudspeaker against the ceiling. NOTE: DO NOT OVER TIGHTEN THESE SCREWS. Over- tightening the screws may make the grille difficult to install.

7.Install the grille into the speaker.

8.Repeat this procedure for the next speaker.

Removing the Grilles:

To remove the grille from the LSC-5, obtain a small paper clip (size #1, common) and bend the last quarter inch of it into an “L” shape.

Holding the paper clip with a pair of pliers, insert the end with the “L” into a hole near the edge of the grille. Remove the grille by pulling the paper clip towards you.

For the LSC-5R, press your fingers against the inside of the grille’s white collar. While pressing against the collar, pull it towards you.

3

Image 5
Contents LSC-5/5R LSC-5 / 5R Table of ContentsProduct Overview FeaturesInstallation friendly design Preparing for Installation Package ContentsInstallation Existing Construction Tools RequiredRemoving the Grilles Installation New ConstructionOperation SpecificationsLimited Warranty

LSC-5/5R specifications

JobSite Systems has developed an innovative solution in the realm of construction and logistics management with its LSC-5/5R model. This advanced system is designed to streamline operations on job sites, enhancing efficiency while ensuring reliable and precise performance. The LSC-5/5R model incorporates a plethora of features, technologies, and characteristics that make it a formidable asset in the construction industry.

One of the standout features of the LSC-5/5R is its robust construction. Built to withstand harsh job site conditions, this system is both weather-resistant and durable. Equipped with high-quality materials, it ensures longevity despite exposure to the rigors of construction environments. The LSC-5/5R has also been designed with user-friendliness in mind, featuring an intuitive interface that allows operators to quickly learn and master the system.

Another significant aspect of the LSC-5/5R is its advanced technology. At the core of the system is a powerful GPS module that allows for precise location tracking. This technology facilitates real-time monitoring of equipment and materials, which is vital for maintaining workflow and reducing downtime. The system can integrate seamlessly with management software, providing an efficient platform for data sharing and communication among team members.

The LSC-5/5R also boasts a flexible configuration that adapts to different project requirements. It can be scaled to manage various volumes of materials, making it suitable for both small projects and large-scale construction undertakings. Additionally, the unit features a battery life that supports extended work hours, reducing the need for frequent recharging and keeping operations constant.

Safety is another priority in the design of the LSC-5/5R. The system incorporates various safety features, including overload sensors and emergency shut-off mechanisms. These elements work together to minimize risks and ensure compliance with safety regulations on job sites.

In conclusion, the JobSite Systems LSC-5/5R is a cutting-edge solution that combines durability, advanced technology, and user-friendly design. Its capabilities in real-time tracking, flexibility in operation, and commitment to safety make it a valuable tool in the construction industry. As projects grow increasingly complex, the LSC-5/5R stands out as an essential component in facilitating efficient and organized job site management.