Premier Mounts PBM-070L installation instructions Ceiling Installation

Page 5

PBM-070L

Ceiling Installation

Step 1. Separate the top bridge from the base box by removing the six (6) M6 x 12 mm screws that are located on the base box, three on each side (A).

Step 2. Secure the top bridge to the ceiling structure at this time (see warning label) using commercially available hardware (B). Step 3. Use the two (2) middle slot openings for single wood stud mounting. All other mounting points on the top bridge may be

used depending on your installation application (B).

Step 4. Replace the base box to the secured top bridge and secure with the six M6 x 12 mm screws (C).

A

B

C

Ceiling Structure Wood Stud

Top Bridge

Lag Bolts

(Commercially Available)

Base Box

Installation Manual

Page - 5 -

Image 5
Contents Installation Instructions Table of Contents Installation Tools Parts ListProjector Bracket Installation Ceiling Installation Installation Manual Projector Adjustment Technical Specifications What is Not Covered Limitations WarrantyWhat Customers Must Do for Limited Warranty Service What Premier Mounts Will Do