VXI CT-400 Option 100 Adjustable Rack Mount Flanges with Handles, Required Tools, Parts List

Page 30

VXI Technology, Inc.

OPTION 100 - ADJUSTABLE RACK MOUNT FLANGES WITH HANDLES

This procedure provides the necessary instructions for installing the adjustable rack mount flanges with handles.

Required Tools

1)#2 Phillips Screwdriver

2)T15 Torx® screwdriver

Parts List

Item#

Qty

Description

VTI P/N

1

12

Screw, 8-32 x 5/8" Button Head Torx, Black Steel

37-0130-062

2

1

Rack Mount Bracket, Standard, Left Side

41-0221-000

3

1

Rack Mount Bracket, Standard, Right Side

41-0221-001

4

4

Screw, 8-32 x 3/8" Flat Head Phillips, Zinc

37-0080-037

5

2

Handle, Chassis, 1 9/32" x 4", Black Aluminum

37-0134-000

Assembly Procedure

1)Lay the mainframe on a protected work surface on its long side with the voltage monitor LEDs of the mainframe facing front with the power switch toward the top.

2)Locate the right and left side rack mount brackets. Install the rack mount brackets using twelve 8-32 x 5/8" button head Torx screws. Refer to Figure 2-3for guidance. Depending on how the rack mount brackets are installed, the mainframe can be recessed up to 10" or can be extended from the rack up to 5".

3)Locate the handles for the rack mount brackets. Use the 8-32 x 3/8" flat head Phillips screws to install these handles as shown in Figure 2-3.

30

CT-400 Installation

Image 30 Contents
CT-400 Chassis Page Table of Contents VXI Technology, Inc Certification WarrantyLimitation of Warranty Restricted Rights LegendEMC Steve Mauga, QA ManagerGeneral Safety Instructions Terms and SymbolsUse Proper Fuse Support Resources VXI Technology, Inc CT-400 Introduction Introduction IntroductionBackplane Power SuppliesGeneral Description CoolingCT-400 Mainframe Features Feature Replaceable power supply unitVoltage Indicator Leds Front Panel Voltage IndicatorsRear Panel Monitor / Control Connector PIN Signal DescriptionCT-400 Specifications MtbfMttr Voltage Peak Current IMP Dynamic Current IMD TOP View Rear View CT-400 Options Options 100 & 106 Mounting FLANGES/HANDLES & 2U Cable Tray Option 106 2U Cable Tray Rear View VXI Technology, Inc Option 104 Hinged Custom Front Panel VXI Technology, Inc CT-400 Introduction Installation Power Requirements Connecting the Mainframe to Earth Ground AIR Flow RequirementsInstalling the Card Shield Option Installing Blanking PanelsBENCH-TOPCT-400 USE OverviewOption 101 VXIplug&play VPP-* Rack Mount Kit Option 100 Adjustable Rack Mount Flanges with HandlesRack Mounting the CT-400 Option 102 Rack Mount SlidesAssembly Procedure Option 100 Adjustable Rack Mount Flanges with HandlesParts List Required ToolsAdjustable Rack Mount Flange Installation Diagram Option 101 VXIPLUG&PLAY Rack Mount KIT Mounting Receptacle Supplied By Customer Option 102 Rack Mount Slides Rack Mount Slide Installation Diagram Option 104 Hinged Custom Front Panel Additional Rack Mount OptionsOption 103 Transparent Front Door Option 105/106 1U / 2U Cable TraysCT-400 Installation Option 103 Transparent Front Door Installation Procedure Transparent Door Installation Diagram Option 104 Hinged Custom Front Panel Installation Procedure Customizable Front Door Installation Diagram Option 105/106 1U/2U Cable Trays Installation Procedure 1U TOP and 2U Bottom Cable Tray Installation Diagrams Installation of VXI Modules Installation ProcedureDisconnecting the Mainframe VXI Technology, Inc CT-400 Installation Remote Power Control OperationCT-400 Monitor Board CT-400 Monitor Board Signals Connector J210Connector J211 Service Information Cleaning the AIR Filters Cleaning the Power Supply Fan FilterCleaning the Module Fan Filter Power Supply Replacement Procedure VXI Technology, Inc CT-400 Index Page Index