Winegard SK-7002 installation manual Press Enter

Page 7

A. Press [ENTER] the TRAV’LER will return to the “Installation Menu”

OR

B. Press [POWER] the TRAV’LER will stow and turn “OFF” (Restart at Step 1).

Refer to the SKA-722 Manual for instructions on how to install the Reflector and Bracket.

Manual:

1.Press [POWER] and hold for 2 seconds to turn “ON” the TRAV’LER Interface Box. Wait until the

Interface Box finishes “connecting to antenna”.

* The TRAV’LER may enter the “Search Routine” after 10 seconds this is normal (See NOTE Below).

2.Press [ENTER] and hold for 2 seconds or until the unit displays “Enter User Menu”. Press [SELECT] to move the asterisk to “Yes”. Press [ENTER].

3.Press [SELECT] to move the asterisk to INSTALLATION.

4.Press [ENTER]. You will be asked to provide a code to enter the Installation Menu.

5.Press [ENTER] 4 times to enter code 0000.

6.Press [SELECT] to move “ * ” to “Calibrate EL”.

7.Press [ENTER].

8.Press [SELECT] to move “ * ” to YES.

9.Press [ENTER] to start the elevation calibration procedure. The LCD should now display “ Cali- brate EL In Progress ...”.

10.After a few moments the IDU LCD will display “On EL Hard Stop?- Yes *No”. Visually examine the antenna to verify that the antenna is against the Hard Stop. The antenna will be pointing as far up as it can go, this is the Hard Stop.

11.Press [SELECT] once to move asterisk to “Yes” if antenna is on the Hard Stop.

12.Press [ENTER] and the LCD will display “Calibrate EL Success”.

13.You may now stow the antenna.

INSTALLATION

7

Image 7
Contents Winegard TRAV’LER Selecting a Location for the TRAV’LER Antenna Recommended ReceiversTransition Plate Make sure to clean the installation area before you begin TRAV’LER Mount InstallationCable Entry Plate Installation GPS InstallationYou will need to run Raise Antenna Cable installationReflector Installation AutomaticPress Enter Pinch Point Pinch Points Hooking up the Shaw Direct receiverAppendix Making the Right Connection with Hex ConnectorsSatellite Receiver Warranty Installation Winegard Company 3000 Kirkwood St. Burlington, IA