Premier Mounts AM250-FLIP Securing and Leveling the Display, Tilt Positioning

Page 10

AM250

Securing and Leveling the Display

Once the brackets have been placed over the upper mounting bars on the AM250, use two (2) M6 x 30mm Phillips Head locking screws to secure the brackets to the bottom of the mounting bars. This will prevent lateral shift movement. Level your flat panel by installing the two additional M6 x 30mm Phillips Head screws to the upper bracket assembly as shown below. Once the display is level, tighten the locking screws.

M6 x 30mm Phillips

Head Screw

M6 x 30mm Phillips

Head Screw

Lower Locking Point

Upper Bracket Leveling

Adjustment Screw

Tilt Positioning

TO ADJUST THE TILT TENSION OF THE AM250, LOOSEN THE TENSION BOLTS LOCATED ON THE BOTTOM RIGHT AND LEFT SIDE OF THE MAIN ARM ASSEMBLY. RE-TIGHTEN THESE BOLTS TO ACHIEVE YOUR DESIRED TENSION.

To adjust the tilt of the display, place a hand in the top middle of the display and the other hand at the bottom middle of the display.

To Tilt the Display Forward

Gently pull on the upper portion of the display while pushing the lower end of the display away from you. This motion will cause the display to tilt forward.

To Tilt the Display Back

Gently push on the upper portion of the display and pull the lower end of the display towards you. This motion will cause the display to tilt back.

Display

Tilt Tension Adjustment

Page 10

Installation Instructions

Image 10
Contents Installation Instructions Universal Swingout ArmTable of Contents Installation Tools Parts ListParts List Qty Flat washers Metal Qty Thread Depth Indicator Mount Installation StepUniversal Mounting Bracket Assembly Concrete MountingAttaching the Display Securing and Leveling the Display Tilt PositioningTechnical Specifications 90.17 406.40 38.04 14.03 356.36Premier Mounts Limited Lifetime Warranty