Acer | Acer |
7.1.3Non operation Thermal Shock Test
| Item |
| Description |
| Temperature |
| |
| Reset cycles times |
| 25ºC>60ºC (10hrs)>25ºC |
|
| 3cycles ,every transition time 0.5 hr, | |
|
|
| |
|
|
|
|
| Total cycles |
| 3 cycles |
7.1.4Package Drop
Drop height (Select drop height according to the gross weight refer to the table at below)
|
| Gross Weight(kg) |
|
|
| 1.0<W≦9.0 | ||
|
|
|
|
|
|
|
|
|
|
| Drop Height(cm) |
|
|
| 76 |
| |
|
|
|
|
| √ | |||
|
|
|
|
|
|
| ||
|
|
|
|
|
|
| ||
Drop sequence and orientation |
|
|
| |||||
|
|
|
|
| ||||
Drop | Drop onto | Type Drop | Figure |
| ||||
Step 1 | Corner |
|
| |||||
|
|
|
|
|
| |||
Step 2 | of package | Edge |
|
| ||||
|
|
|
|
|
| |||
Step 3 | of package | Edge |
|
| ||||
|
|
|
|
|
| |||
Step 4 | of package | Edge |
|
| ||||
|
|
|
|
| ||||
Step 5 | Flat |
|
| |||||
|
|
|
|
|
| |||
Step 6 | of package | Flat |
|
| ||||
|
|
|
|
| ||||
Step 7 | Flat |
|
| |||||
|
|
|
|
| ||||
Step 8 | Flat |
|
| |||||
|
|
|
|
|
| |||
Step 9 | of package | Flat |
|
| ||||
|
|
|
|
|
| |||
Step 10 | of package | Flat |
|
| ||||
|
|
|
|
|
|
|
|
|
Mechanical and electrical damage should not exist after vibration test, and shall be submitted for approval customer before mass production.
8. Marking and Identification
8.1S/N Label
The approval marking is required by the countries of sales destination.
8.2 Carton label
The approval marking is required by the countries of sales destination.