Chief Manufacturing CM8 installation instructions Concrete Installation

Page 7

Installation Instructions

1b

3

5

4

1

2

Concrete Installation

NOTE: Mount the wall bracket in four spots, spaced a

 

 

 

x 4

minimum horizontal distance of 12" (30.5cm).

 

 

1.Level wall bracket (B) and mark locations of pilot holes.

1/2" x 2-1/2" (12.5mm x 63.5mm) 2. Drill four 1/2" x 2-1/2" (12.5mm x 63.5mm) pilot holes into

mounting surface.

(H4) x 4

3.Install four anchors (H4) into pilot holes, inserting end that

opens slightly first. Tap with hammer until flush with concrete surface.

4. Using a socket wrench, install four 5/16" x 2-1/2" hex head lag screws (H2) and four 5/16" flat washers (H1).

5. Slide latches to outside.

5

(H1) x 4

(H2) x 4

7

Image 7
Contents CM8 Disclaimer By Hand Tools Required for Installation Dimensions 1a3 Wood Stud InstallationConcrete Installation Attaching Brackets to Display Display Falling Causing Serious Personal Injury Installing DisplayConnecting Electrical Components Adjusting Tilt Removing Spring to Tilt Display Adjusting Upright Position of Display Optional Setting Preset Position Installation Instructions +31 040