Sony CDP-CE275, CDP-CE375 service manual Balance Check

Page 6

CDP-CE275/CE375

Ver 1.1 2001.07

E-F Balance Check

Checking Location:

Connection:

 

 

– BD BOARD (Conductor Side) –

 

oscilloscope

BD board

 

TP (TE1)

+

TP (VC)

Procedure:

1.Set the test disc (PATD-012). Disc chucking operation is complete, then press the [POWER] button to turn the power off.

2.Connect an oscilloscpe to test point TP (TE1) and TP (VC) on the BD board.

3.Connect between test point TP (ADJ) on the MAIN board and GND by lead wire.

4.Press the [POWER] button to turn the power on and enter the ADJ mode, then playback the number two track automatically.

5.Press the [TIME] button. (The tracking servo and the sledding servo are turned OFF)

6.Check the level B of the oscilliscope waveform and the A (DC voltage) of the center of the Traverse waveform.

Confirm the following : A/B x 100 = less than ± 22%

Traverse Waveform

Center of the waveform

B

A (DC

0V

voltage)

level: 1.15 ± 0.5 Vp-p

7.Press the [TIME] button. (The tracking servo and sledding servo are turned ON)

Confirm the C (DC voltage) is almost equal to the A (DC voltage) is step 6.

Traverse Waveform

IC150

TP (VC)

IC131

TP

 

 

(FE1) IC101

TP (TE1)

TP

(RFDC) TP (RFAC)

0V

 

 

 

 

 

 

 

 

 

 

C (DC

 

 

 

 

 

 

 

 

 

 

voltage)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tracking servo

 

 

 

Tracking servo

 

 

 

Sled servo

 

 

 

 

 

 

Sled servo

 

 

 

 

 

 

 

OFF

 

 

 

 

ON

 

 

Checking Location: BD board

14

Image 6
Contents Specifications 873-822-12Fluorescent Indicator Tube ALL LIT, and KEY Check Mode Test ModeADJ Mode SectionButtons and Corresponding Button Numbers Button Button Number or DisplayAging Mode Mechanism Deck Check ModeRfdc Level Check Electrical AdjustmentsCurve Check Rfac Level CheckBalance Check Section Diagrams Circuit Boards LocationIC BD To Main Board IC BD Schematic Diagram Main Board See page 24 for Waveform CDP-CE275/CE375