Century PM-1645AA Floor Handle, Attachment Straps Floor Loop Handle, Floor Loop Opening Handle

Page 9

FOLDING and STORING continued

Playard

1To remove floorboard:

Unfasten attachment straps.

Remove floorboard and set aside.

2Lift Floor Handle, rotate counterclockwise to unlock floor and pull up, approximately 45.7 cm (18 inches).

Floor

Handle

4Gather Playard frame together while pulling up on Floor Loop.

5Wrap floorboard around Playard frame with padding facing in.

NOTE: Floorboard Handle MUST be aligned with wheels as shown.

6Secure Attachment Straps by threading through loops on end of floorboard and

folding back onto itself.

NOTE: Make sure floorboard is positioned above wheels.

Attachment

Straps

Floor Loop

Handle

3To fold top rails:

Pull up on top rail slightly.

Squeeze Release Button on bottom of top rail and push rail down. (Release buttons are identified by printed arrows.)

Repeat for other sides.

NOTE:

If rails are difficult to unlock, raise center of floor higher and

squeeze Release Button again.

If only one side of rail folds, squeeze Release Button again to fully fold.

Release Button

7Position travel bag over Playard so Handle comes through

Opening in side of bag.

Pull travel bag over Playard.

Pull Floor Loop through opening on top of travel bag.

NOTE: To prevent rubbing, make sure travel bag is positioned above wheels.

Floor Loop

Opening

Handle

8

Image 9
Contents Instruction Manual Weight, Height and Activity Limits Table of ContentsImportant Information Need Help?Page Playard Floorboard Attachment StrapsTop Rail Bassinet Attachment StrapHook Slots PocketsChanger Unhook T-Fittings from T-Slots by pulling up Folding and StoringFloor Handle Attachment Straps Floor Loop HandleFloor Loop Opening Handle Replacement Parts MaintenanceCleaning Parts List Model Price Quantity TotalShip to Replacement Parts Order FormRemember