GATE DELAY PACKAGE

(#8100-Gate)

GATE DELAY ADJUSTMENTS

When the gate is completely closed (Tight to rear upright) cable and eyebolt assembly should be adjusted so cable has no slack. Cable should be tight but not overtightened. If cable and eyebolt is overtightened lower cylinder will trip out of the L-shaped slot on the lower bracket too soon and the gate will try to close before the cylinder is stroked out. If the ca- ble and eyebolt is too loose the lower cylinder will not trip out of the L-shaped slot and the cylinder will reach its maxi- mum stroke and the gate will still not be in the closed position. The gate will be held open by the top cylinder bracket and the bracket may become damaged over time. Eyebolt and cable will need to be adjusted periodically to maintain proper operation.

KEY

PART NO.

DESCRIPTION

KEY

PART NO.

DESCRIPTION

1

55-0095

1/8" to 3/8" NPT Reducer

11

952-0007-

7-1/4" Nylon Tie Strap

2

30-0015

1/4x90 Degree Elbow

 

1

 

 

 

 

3

25-8095

Oil Reservoir Assembly

12

25-8098

Cable/Eyebolt Assy.

 

 

 

4

55-0097

3/8 to 3/8" Hydraulic Nipple

13

25-8097-1

Lower Sleeve Spacer

 

 

 

5

55-0094

Flow Control Valve

14

25-8093-1

Lower Shaft Plate Assy.

 

 

 

6

55-0096

3/8 NPT x 90 Degree Male Pipe

15

25-8095-6

Top Copper Line Assy.

 

 

 

 

 

Elbow

16

25-8101

Ground Control Rod Assy.

7

25-8096

Gate Release Trip Arm Assembly

 

 

W/Grip

 

 

 

8

25-8092-1

Gate Regulator Top Shaft Assy.

17

51-0007

Handle Grip

 

 

 

9

25-8090-1

Top Cylinder Bracket Assy.

18

933-3804

5/16 x 4” Eyebolt

 

 

 

10

55-0093

Hydraulic Cylinder

19

825-25-1Z

1/4x1" Self Tapping Screw

 

 

 

8100 Rear Unload

--37--

Image 38
Contents Manufactured by Boss Rear Unload Forage BOX Truck and TrailerOperators and Parts Manual no For Series Table of Contents MANUFACTURER’S Warranty VIIIntroduction Meyer Manufacturing CorporationSafety Precautions Safety First Decal B Decal C Decal D Decal E Decal F Decal G Decal aPRE-OPERATION Tractor Towing Size Requirements Material Estimated Weight PER Cubic FootTransporting LBS / CU. FTRear Unload Operation Rear Opening Discharge DoorRear Unload Lubrication Diagram Both SidesDaily Lubrication END of Crop Cleanup MaintenanceLubrication Adjustments Adjustment DiagramRepair Parts Gearbox & Chain Drive Gearbox & Chain Drive KEY DescriptionHydraulic Plumb to the Front KEY Description Apron Apron Main Body Main Body 1 KEY DescriptionMain Body 2 Main Body 2 Front AIR HOOK-UP Front Fold Down Extension Front AIR HOOK-UP Front Fold Down ExtensionRear Door Rear Door KEY Part no DescriptionOptional Double Door Following Items are not Illustrated Roller Chain Oiler Highway Transport Lights Optional Grain KIT Following Items are not Illustrated Gate Delay Package #8100 Gate KEY Description QTY Gate Delay Package #8100-GateMeyer Forage BOX Maintenance Record Date Service PerformedTruck Mount Models Trailer Models SpecificationsStandard Features Specifica TionsTarp Systems OptionsOPT This Page Intentionally Blank Rear Unload