Garmin PAV80 operation manual Circuit breaker installation drawing 120-800-8802 typical

Page 29

200-800-0101

Appendix B

Rev. 5 Feb. 2004

Figure 6-8 Circuit breaker installation drawing 120-800-8802 (typical)

Breaker Added

for PVA802 ONLY

1

2

3

4

5

6

7

8

9

10

11

12

13

14

 

15

 

16

17

 

PSEngineering PAV80 InstallationandOperator’s

70

5

3

5

3

 

 

5

 

 

 

 

5

5

 

10

 

7.5

5

 

18

19

20

21

22

23

24

25

IFE

27

28

29

VID DIS

31

 

32

 

33

34

 

 

 

 

 

 

 

 

 

 

5

5

5

 

5

5

 

5

 

5

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Manual

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

-----

 

 

 

 

 

 

Breaker Added

 

 

 

 

 

 

 

0

NEW RELEASE

 

 

 

-----

GLP

07-09-03

 

 

 

 

 

 

 

 

 

 

 

REV

 

 

DESCRIPTION

REVISIONS

ECO

BY

DATE

 

 

 

 

was ADF

 

 

 

 

 

 

 

MATERIAL

 

 

 

ENGINEERING

9800 Martel Road

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INCORPORATED

Lenoir City, Tn 37772

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(865) 988-9800

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TITLE

IFE Breaker Location

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ACTIVITY

NAME

DATE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DRAWN BY:

GLP 07-09-03

SIZE

CAGE CODE

DRAWING NUMBER

 

REV

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

120-800-8802

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CHECKED BY:

RSH

 

NONE

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

APPROVAL:

07-09-03 SCALE

 

SHEET 1 OF 1

Image 29
Contents PS Engineering, Inc RevisionEquipment Required but not Supplied Appendix E Rtca DO160D/EUROCAE ED-14D Environmental Introduction Section I General InformationScope Equipment DescriptionFAA-PMA Compliance SpecificationsEquipment Supplied FAA-TSO ComplianceEquipment Required but not Supplied PVA802 Installation KitOptional Equipment License Requirements Approved Audio SystemsEquipment Installation Procedures Section II InstallationGeneral Information Unpacking and Preliminary InspectionFactory Avionics Location Mounting Rack InstallationPanel Opening Connector AssemblyNoise Cable Harness WiringAntenna PowerBacklighting Unit Installation Aux Entertainment Audio and AUX EnablePVT801 Display Installation Optional PVA802 Video Distribution Amplifier InstallationSystem Checkout Internal AdjustmentsPost Installation Checkout Final Inspection FM/COM Cross ReferenceSection III Operation Power/Volume ControlOperating Controls Stop/Eject ButtonButton Mode KnobDisplay Operation Data knob PushRemote Operation N UDisplay Dimming Factory Service Section IV- Warranty and ServiceWarranty Creating MP3s from an Audio CD Appendix a MP3 CreationNew Installation Side Connector Key Display connector layout PVT801 Mounting Tray Dimensions if used Circuit breaker installation drawing 120-800-8802 typical 470 Single Display System Appendix C Connector InterconnectPVT801Video Terminal#4 Multiple Display System WiringInstructions for Continuing Airworthiness, PAV80s Instructions for FAA Form 337, PAV80sTitle This manual Part Number Revision Date Master Drawing ListAppendix D Rev , Feb Conditions Section Conducted Tests