
S T E P
S T E P 1
S T E P
S T E P 2
1
2
ORANGE BAG
•Fold up the
•Insert the bolt (M8 x 50L) in the side and tighten with the
•Insert one bolt (M8 x 20L) in the front and tighten with the
•Repeat this on the opposite side.
NOTE: There are no data cables on the left side.
BLUE BAG
•Slide the base side covers down the
•Fold the treadmill to the vertical position.
•Secure the
•Unfold the treadmill.
5