S T E P 1 | ORANGE BAG |
| NOTE: During assembly, it is recommended |
| to ensure that all bolts are in place and |
| partially threaded before completely |
| tightening any one bolt. During assembly |
| steps 1 thru 5, do not completely tighten |
| any bolts until completion of Step 5. |
| • Lay the main floor support (AC1) on the |
| ground, pulley brackets facing up. Place |
| the end opposite of the pulley brackets |
| against the side of the left floor support |
| (AC5). Align the main floor support holes |
| with the 3rd and 4th holes from the end of |
| the left floor support. Secure using two |
| bolts (M10x70), four flat washers |
| (10.2x22x2), and two nylon nuts (M10). |
| • Stand the weight stack tower (AB1) |
| upright and place the previously |
| assembled floor supports (AC1 & AC5) up |
| against holes in the tower. Slide three bolts |
| (M10x70) with three flat washers |
| (10.2x22x2) through the holes, securing |
| the bolts with three more flat washers and |
AB1 | three nylon nuts (M10). |
| |
| • Attach two pulleys to weight stack using |
| a bolt (M10x46), two flat washers |
| (10.2x22x2), and a nylon nut (M10) for |
| each pulley. |
AC1
AC5
11