Vision Fitness ST770 manual Pink BAG

Page 13

S T E P 3

PINK BAG

• Set the swing arm support (AC4) against the remaining holes in the side of the main floor support (AC1) and secure using two bolts (M10x70), four flat washers (10.2x22x2) and two nylon nuts (M10). Secure the connection in front of the weight stack with two bolts (M10x120), four flat washers (10.2x22x2), and two nylon nuts (M10).

• Place the dual pulley bracket (AG1) in between holes on the swing arm support (AC4) and the weight stack tower (AB1). Use two bolts (M10x120), four flat washers (10.2x22x2), and two nylon nuts (M10) to secure the swing arm support side of the bracket. Use two bolts (M10x140), four flat washers and two nylon nuts, respectively, to secure weight stack tower side.

AB1

AG1

AC4

M10x120

AC1

AC5

13

Image 13
Contents S e m b l y & O w n e r ’s G u i d e Page Table of Contents S e m b l y N e r ’ s G u i d e E P Blue BAG Pink BAG E E N B a G Black BAG Yellow BAG Partially threaded before completely Blue BAG Pink BAG E P 4 Green BAG E P 5 B L a C K B a G E P 6 Y E L L O W B a G D B a G E P 8 Light Blue BAG Page Resistance Training Benefits and Tips Training Programs Stretching BICEP/CHEST Stretch E M ST770 Commercial Warranty Page Page Page Page Page Page S i o n