S T E P 4 GREEN BAG
Z38
K05
Q09
K01
K02
Q08
•Secure top and bottom shield brackets (Q08) to weight stack tower using bolts (M5x10), lock washers (5.1x9.3x1.3), and flat washers (5.3x10x1) provided. Repeat for all side brackets (Q09).
•Place two rubber weight plate bumpers (Z39) over the holes in the lower cross tube of the weight stack tower. With the horizontal holes of the guide rods (K05) at the top, place the guide rods over and through the rubber weight plate bumpers into the weight stack tower. Let the guide rods tilt outward from the tower. Slide each of the 20 weight plates (K02) over both of the guide rods on top of one another. Place the header weight plate (K01) over both guide rods on top of other weight plates.
•Make sure rubber guide rod sleeves (Z38) are in place in top holes of the weight stack tower. Lift the guide rods into top of weight stack tower until holes in the guide rod are lined up with the horizontal holes on the top of the weight stack tower. Insert a bolt (M8X62) and flat washer (8.4X15.5X1.6) through each guide rod and fasten with a flat washer (8.4X15.5X1.6) and a nut (M8).
14