BUSHING REPLACEMENT - CONTINUED
|
| Bolt | |
Rubber Stops |
| ||
|
|
| |
In |
|
|
|
|
|
|
|
|
|
|
|
Pivot
Bracket
13.Remove the bolts(6mm), nuts(13mm), and bushings on both sides of incline pivoting brace.
14.Remove the retaining bolts(5mm) and rubber stops at the ends of the
15.Cut the tie wraps securing the Console Cable along side of the base frame.
Base Frame
16.Slide the base frame forward just enough to allow replacement of Track Sliders, Bushing Spacers, and Connection Tube Bushings.
Connection Tube Bushing
17.Install new kit components and
Track Slider
Bushing Spacer
3
ASSY INSTRUCTIONS, KIT, FT BUSHING 77650901