Spirit ZE20 owner manual Assembly Instructions, Assembly Pack Check List

Page 6

Assembly Instructions

ASSEMBLY PACK CHECK LIST

M8x20mm Button Head Socket Screw (4pcs)

M8x15mm Hex Head Screw (6pcs)

M8x50mm Button Head Socket Screw (2pcs)

M8x45mm Button Head Socket Screw (4pcs)

M4x30mm Self Tapping Screw (4pcs)

5/16” x 19 x 1.5T Curve Washer (6pcs)

5/16”x23x1.5T Flat Washer (8pcs)

M8 Nylon Nut (2pcs)

13/14mm N Wrench (1pc)

M5 Allen Wrench (1pc)

Screwdriver(1pc)

Assembly

STEP 1

Install the Front and rear stabilizer into the Frame Base Support with 4pcs of M8x45m/m Hex Head Screws and 4pcs of 5/16”x23x1.5T Flat Washers. Then tightly fasten 4pcs of M5x38m/m Self Tapping Screws of the Front and rear Stabilizer Cover by using the 13/14mm N Allen Wrench and Screw Driver.

(As shown in Fig.1~7)

STEP 2

Connect the Computer Cable (Upper) with Computer Cable (Lower). (As shown in Fig. 8)

STEP 3

Install the Front Post into the Main Frame with 6pcs of M8x15m/m Hex Head Screws and 6pcs ofψ 5/16”xψ 19 x2T Curve Washers by using the 13/14mm N Allen Wrench . (As shown in Fig. 9)

STEP 4

Connect the Computer Cable (Upper) with the Hand Pulse Cable. Install the Console with 4pcs of M5x15m/m Button Head Socket Screws by using the Screw Driver.

(As shown in Fig. 10~11)

5

ZE20

 

Image 6
Contents Page Table of Contents Product Registration Record Your Serial NumberImportant Safety Instructions Important Electrical Information Important Operation InstructionsAssembly Instructions Assembly Pack Check ListZE20 Assembly Photos ZE20 Transport Getting familiar with the control anel ConsolePower up Starting a program Quick StartManual Preset Programs User ProgramTarget HR Recovery Window DisplayManufacturer’s Limited Warranty Elliptical Warranty