
Carefully place the BEARINGHOUSINGand the BACKSUPPORTFRAMEon the floor ~nd loosely assemble them together before attaching them to the REARRIGHTUPRIGHT,using one (1) 318 X BOLT, two (2) 3/8 WASHERS,one (I) 3/8 LOCKWASHER,and one (1) 3/8
Insert one (1) 2 IN SQ. ENDCAPinto the end of the PULLEYBRA~CKETSUPPORT.
Loosely assemble the BEARINGHOUSING/BACKSUPPORT. FRAMEASSEMBLY,and the PULLEY BRACKETSUPPORT to the EX500 BASE UNIT'S REAR RIGHT :UPRIGHT CONNECTIONPOINTS#1 and #2, using the following hardware:
CONNECTION#1: two (2) 3/8 X
CONNECTION#2: one (1) 3/$ X3 BOLT, two (2) 3/8 WASHERS,one (1) 3/8 LOCKWASHER, one (I) 3/8 NUT.
;OTE: PULLEY FLATS MUST BE ANGLED DOWNWARDON THE PULLEY BRACKET SUPPORT.
Tighten all loose bolt connections for FRAMEASSEMBLY.
Insert r~vo (2) 2 IN. SQ. ENDCAPSinto each end of the BEARINGHOUSING.
Carefully insert two (2) FLANGEBEARINGSinto the top and bottom sides of the
on each end. (4 BEARI'NGStotal), (CAUTION: DO NOT OVERTAP THESE BEARINGSINTO PLACE, WHICH CAN CAUSE DEFORMATION TO THE BEARING, MAKING THI"M? UNUSABLE)
Insert four (A) 2 IN. SQ. ENDCAPSinto both ends of the LEFT, and RIGHTPEG DECARMS.
Insert the LEFT and RIGHTPEG DEC ARMSthrough the FLANGEBEAK.r%'GSin the BEARING HOUSLNGon their respective sides and secure them in place with the two (2) PUSHONCOLLARS-
Removethe paper backing from the two (2) PLASTICSTOPSand adhere them to the backside of the BEARINGHOUSINGCAMSTOP, approximately where shown, in order to give the PEG
Loosely Assemble t~vo (2) 3/8 DIA. X I IN. LG. BUSHINGPULLEYSand two (2) CABLE RETAININGCLIPS to the PULLEYBRACKETSUPPORT.u~ing t~vo (2) 3:'8 X
(2)3 8 LOCKWASHERSand. two 3 8 NUTS.Connection will be tightened after the cable has been routed. (in STEP#2)
SIide the two (2) 12 IN. ARMROLLERPADSonto each PEGDECARM.Ifa lubricant is required. RUBBINGALCOHOLthorouT.Thl.v coating the inside of the grip is the best material to use.