503EXS00 PEG DEC
(STEe#2) | ¯ ¯ | ..... |
|
THE ~RU~IONS FOR ~EP ~2 ARk T0 BE USED'WITH D~G SHEET ~! OF
1.Loosely ~cmble one (I) 3/8 DIA. X 1 IN. LG. BUSH~GPULLEY ~d 0n~ (1) CABLE
2.
CL~ to ~e PULLEY FLAT on ~e WEIGHT STACK S~PORT BASE, (CON~ION PO~ #3), using one (1) 3/8 X
A).
ASSEMBLE~e SWIVEL PULLEY B~C~TS using (1) 3/8 DIA x 3/4 BOLT, (2) ~/16 WAS~,
(1)3/8 WASHER~d (1) 3/8 LOCK NUT. ~IGHTEN UNTIL LOC~D, THEN'BACK O~
TURN.) (SEE DETAIL | ' |
|
3.LOOSELYa~ach m'o (2) 3/8 DIA. X 1 IN. LG. BUSHINGPULLEYSMto ~e PULLEYE'.~C~T.- ASSEMBLY,using ~vo (2) 3/8 X
(4)CAPS. (SEE DETAIL "B")
NOTE: BEFORE PROCEEDING WITH CABLE INSTALLATION, UNtiL CABLE, AND .REMO~
AS MUCH SPI~LING AS POSSIBLE.
4.~oute the PEC DEC LOOP CABLE ASSEMBLYthrough th~ top halfof~e PULLEYB~kC~T
ASSEMBLY.and securely a~ach each CABLEEND to cnch CAMon the LE~ and ~GHT PEC DEC ARMS,using two (2) 3 'l 6 X 1 BOLTS,FOUR(4) ~/16 WASHERS, ~vo (2) 5/16 LOCKWASHERS, two (2) ~/16 NUTS.
NOTE MAKESURE CABLE ENDS ~EST FLAT AGAINST THE INSIDE OF THE CAMS) (SEE DETAIL C AND PULLEY REFERENCE POINTS A, B, & C ON THE CABLE
NOTE: POSITION THE CABLE RETAINING CLIPS O~ THE PULLEY B~CKET SUPPORT IN A VERTICAL POSITION AFTER PEC DEC LOOP CABLE ASSEMBLY HAS BEEN ROUTED, AND TIGHTEN SECURELY (SEE ASSEMBLY VIEW ON SHEET
SKIP SEOUENCE ~5 IF ASSEMBLING PEC DEC AND THE BASE U'NI~T THE SA~IE TI~E.
5.Disconnect the OLD SECONDARYCABLE ASSEMBLYat the LEG CURL ATTACHMENT CONNECTIONPOINT #4 (SEE DETAILD) and remove it by pulling it out from the LOWROW
PULLEYSTATION(CONNECTIONPOINT #5) | and discard. Loosen the bolt connection |
PULLEY REFERENCE POINT H so that | the SECONDARYCABLE ASSEMBLIES (OLD & NEW |
SWAPOUT)can be passed under the CABLERETAINERCLIP.
5.
,
.....
Reroute the new SECONDARYSWAPOUTCABLEASSE.MBLYb.v starting at PULLEYreference point D on the CABLEROUTINGDIAGRAM.Continue to pass the CABLEASSEMBLYover PULLEYSREFERENCEPOINTS E, F. G, & H, and reartach the CABLEend to the LEG CURL EXTENSION CAM as shown in DETAIL D. (MAKE SURE CABLE END RESTS FLAT ON THE
CAM)Re ti,_,hten the [',.~'.t connections at PULLEYREFERENCEPOINTSH (ADJUSTABI'.EPRE
TIGHTEN all PULLEY CONNECTIONS.