ParaBody 841101 manual Step

Page 8

FIGURE 8

STEP 8:

¯Route threaded end of the LATCABLE(15) around the one of the PULLEYSin PLATE& PULLEYASSEMBLY(17) through the holes in the TOPBOOM(2) as shownin FIGURE

SECURELYassemble two 3-1/2" PULLEYS(12) to the TOPBOOM(2) using two 3/8 X 2-3/4" BOLTS(25), figur FLANGESPACERS(33), and two 3/8" LOCKNUTS(32). See FIGURE 8. (NOTE: BEFORETIGHTENING,MAKE CABLE(15) IS IN TIlE GROOVESOF TIlE PULLEYS.)

Image 8
Contents Serious Steel Bolt LengthRuler Partslist Page Step Step CABLE15 is in TIlE Groovesof TIlE Pulleys Step X 3~~ X 2-3/4~ Step Page Step