ParaBody 897101 manual Prosystem, Lock NUT

Page 3

897101 WEIGHTSTACK OPTION ASSEMBLYINSTRUCTIONS;

o

Removethe ].AT BARfrom the HIGHPULLEYCABLE,and set aside. Loosen and re,hove the three (3) 3-1/2 X 1 IN PULLEYSfrom the TOP BOOMWELDMENTof the PROSYSTEMDetach. HIGH PULLEYCAl3LE from the WEIGHTCARRIAGEWELDMENT,remove the CABLE.

Loosen and remove TOP BOOMWELDMENTfrom the PROSYSTEM.Then Remove the WEIGHT CARRIAGEWELDMENTfrom the PROSYSTEM.

Removethe 2 IN SQ ENDCAPSfrom the top and bottom of the UPRIGI-/T FRAMEWELI)MENTof the

PROSYSTEM.

Insert four (4i) 2 IN SQENDCAPSinto the ends of the BASEWELDMENTas shown on drawing.

Loosen the night bolt connection of the BASEto the UPRIGHTFRAMEWELDMENTon the.

PROSYSTE~Iand remove nut. SECURELYassemble the BASE WELDMENTto the ~?RIGHT FRAMEWELDMENTof the PROSYSTEMas shown, using the replacement 1/2 IN LOWI-IEIGHT

LOCK NUT.

Insert the GU-IDERODSinto the holes of the BASEWELDMENTas shown, and allow them to tilt back. (NOTE: LUBRICATEGUIDE RODS WITH A SILICON OR TEFLONSPRA]0. Slide the two (2) WEIGHTSTACKCUSHIONSdown over the GUIDERODSas shown.

SECURELYassemble the WEIGHTSTACKSHAFTto the HEADPLATE as shown oa drawing. Also insert two (2) WEIGHTPLATEBUSHINGSeach into twenty (20) WEIGHTPLATESas shown (DETAH~A).

USING EXTREMECAREslide the WEIGHTPLATESdown over the GUIDE ROILS onto the WEIGHTSTACK CUSI-HONS as shown. (MAKE SURE THAT THE KEY HOLES OF THE WEIGHT PLATES ARE ALL FACING AS SHOWN) Slide the HEAD PLATE ASSEMBLYdown over the GUIDERODSonto the WEIGHTSTACKas shown.

Part Number 6660001

3

12/30./96

Image 3
Contents SeriousSteel Weightstackcable Guiderodbushing WeightstackcushionPulleyhousingweldment WeightstackshaftLock NUT ProsystemBoom Weldment Supports RUN Underneaththe Cable Inside of the TOP BoomIAS Shown PARABODY, INC