STEP 7:
Insert the threaded end of the CABLE (21) where UPPER PULLEY (H) was located.
Lower the CABLE (21) down the long vertical tube that is in front of the gym until it can be retrieved near where the LOWER PULLEY (M) was located. Carefully pull enough cable out to reach the ROLLER CARRIAGE (Q).
REINSTALL the LOWER PULLEY using the previously removed M10 x 55mm SCREW (N), M10 WASHERS (O), and M10 HEX NYLOCK NUT (P). Be sure that the CABLE (21) is properly routed around the PULLEY.
Bring the threaded end of the CABLE (21) up to the ROLLER CARRIAGE (Q) and thread the CABLE (21) into the ROLLER CARRIAGE (Q). Do not tighten!
Assemble the MIDDLE UPPER PULLEY (13) by using two FULL PULLEY COVERS (44), one PULLEY RETAINER (36), one M10 SOCKET HEAD NUT (34) and one M10 x 50mm HEX TENSION SCREW. (38).
Feed the cable end with the small ball between the MIDDLE UPPER PULLEY BRACKET (S) and then through the forward most hole in the MIDDLE BRACKET TUBE (3) above the HEAD PLATE PULLEY ASSEMBLY (19).
Take the CABLE (21) down and around the HEAD PLATE PULLEY (19) and back up through the MIDDLE BRACK- ET TUBE (3) again, passing through the remaining access hole.
Feed the CABLE (21) around where the UPPER PULLEY (H) of the RIGHT TOWER (11) was located. Forward the CABLE (21) through the TOP BRACKET TUBE (2) and out the access hole where the UPPER PULLEY (H) was located.
REINSTALL UPPER PULLEY (H) using the previously removed M10 x 50mm SCREW (I), PULLEY RETAINER (J), M10 SOCKET HEAD NUT (K), and PARTIAL PULLEY COVER (L). Be sure that the CABLE (21) is properly routed around the PULLEY.
Bring the CABLE (21) down to the ROLLER CARRIAGE (Q).
Feed the CABLE (21) through the two pulleys in the ROLLER CARRIAGE (Q) as shown..
Repeat Step 6 to route the cable through the LEFT TOWER (1).
13