| 11 |
3/8 x 3” 29 | 1 |
| |
| 41 |
| 34 |
3/8 x |
|
| 42 |
24 |
|
FIGURE 14 | 34 |
| 36 |
| 21 |
STEP 14:
•Refer to cable ILLUSTRATION “A” on page 13 for cable routing while installing pulleys.
•[CABLE MUST BE POSITIONED BETWEEN PULLEY AND LOWER BOLT ASSEMBLY ON LEG PEDESTAL (11) AND FRAME (1)]
•Securely assemble the ball end of the LOW CABLE (21) and one
(34). (NOTE: The LEG CABLE (21) should be routed over the retaining bolt as shown in FIGURE 14.)
• Securely assemble one
3/8 X ” BOLTS (29), and one 3/8” LOCKNUT (34). (NOTE: The LEG CABLE (21) should be routed over the retaining bolt as shown in FIGURE 14.)
17