PARTS LIST
KEY | PART # | DESCRIPTION | QTY |
| KEY | PART # | DESCRIPTION | QTY |
1 | CONNECTINGTUBE | 1 |
| 9 | ACUDA1E03823416NB | 3/8 X | 2 | |
2 | PULLEYHOUSING | 1 |
| 10 | ACUDA1E03813416NB | 3/8 X | 3 | |
3 | CABLE RETAINER | 1 |
| 11 | ACUDC1250100020B | 3/8” WASHER | 9 | |
4 | LEG PRESS CABLE | 1 |
| 12 | ACUDB2E03811000B | 3/8” LOCK NUT | 14 | |
5 | 7 |
| 13 | STEP SPACER 19/32” | 4 | |||
6 | ACUDA1E03853416NB | 3/8” X | 2 |
| 14 | STEP SPACER | 4 | |
7 | ACUDA1E03843416NB | 3/8 X | 5 |
| 15 | STEPSPACER | 2 | |
8 | ACUDA1E03833416NB | 3/8” X | 2 |
|
|
|
|
|
NOTE: The LEG PRESS ATTACHMENT (LP5) must be assembled before connecting it to the PARABODY GS1/GS2 GYM SYSTEMS
FIGURE 1 |
REMOVE LOWER |
PULLEY |
1 |
DISCARD! |
CABLE |
STEP 1:
•Remove END CAP and the bolts attaching the FRAME BRACE and insert new CONNECTING TUBE (1) using same BOLTS and re- install endcap.
•Remove the LEG CABLE and the BOLT, NUT and WASHER used to secure CABLE to base. Discard CABLE
4