•Route threaded end of the 122-3/4” LAT CABLE (12) around pulleys in TOP BOOM (2) and PULLEY BLOCK ASSEMBLY. Route 122-3/4” LAT CABLE (12) down through hole in TOWER BRACE (7) as shown in FIGURE 13.
FIGURE 14
27
2
3/8 X 2-1/4” 21
13
12
STEP 14:
•SECURELY assemble one 4-1/2” PULLEY (13) between the plates of the TOP BOOM (2) using one 3/8 X 2-1/4” BOLT (21) and one 3/8” LOCK NUT (27) as shown in FIGURE 14. (NOTE: Make sure the cable runs in the groove of the PULLEY.)