A SS E M B LY
I N S T R U C T I O N S
Step 3
P R E - A S S E M B L E D P A R T S
This step shows the installation of rubber grips CC & CD along with finishing rings CB and caps CA. Wrench tighten.
Part Descriptions | Hardware Descriptions |
1 - Crossover Top Mount Assembly | C - |
| CA - 1 1/4” Dia x 3/4” Aluminum Cap |
| CB - 1 1/4” Dia x 3/8” Aluminum Ring |
| CC - 1.175”OD x .9375” ID x 5.50” LG Grip |
| CD - 1.175”OD x .9375” ID x 17.75 LG Grip |
| CF - 1 1/2” Dia. x 3/4” Aluminum Cap |
| CG - 1 1/2” Dia. x 3/8” Aluminum Ring |
| CH - 1.425” OD x 1.188 ID x 5.50 LG Grip |
| CJ - 1.425” OD x 1.188 ID x 13.75” LG Grip |
Page 9
HOIST
FITNESS SYSTEMS
R
2063 Assembly