BodyCraft BCG 446 manual Install AB Cable

Page 15

STEP 9 INSTALL AB CABLE

Insert eyelet end of AB CABLE(94a) into slot in front of PRESS UPRIGHT(3), over pulley A1, A2 down and around pulley A3 up and around pulley A4 down and around pulley A5 up and around A6, then insert the eyelet end into the slot of PEC DEC UPRIGHT(2) and fixed using 3/8" x 2-1/2" HEX HEAD BOLT(80), two 3/8" WASHER(90) and 3/8" NYLON NUT(87).

(94a)

A1

T8

A4

 

 

A2

 

A3

 

C2

 

A7

 

A6

 

A5

A1, A2

 

 

87

 

90

A7

2

80

90

90

87

A6

C2

87 29

49 82

3, 11a

 

 

A3

 

90

 

49

90

68

 

 

 

 

 

80

 

 

87

 

 

 

90 68

 

 

27a

79

 

49

82

A4

29

T8

87

82

A5

49

1 87

49

82

14

Image 15
Contents Questions? Before YOU Begin Description QTY Parts ListParts Chart 45a 46a 47a 48a 94a Inch Assemble Base Frame Assemble Weight Stack Assemble TOP Frame Assemble PEC DEC Station Assemble Press Station Install TOP Cable Install PEC DEC Cable Install Link Cable Install AB Cable Install Lower Cable Install Accessories Install Weight Stack GUARDSoptional