Braun A5 service manual Certification Checklist Diagnostic Procedures

Page 6

Certification Checklist Diagnostic Procedures

The following operations and conditions must be functionally verified in order for the lift to be FMVSS 403/404 compliant. If an operation does not function as described or a condition is not met, follow the refer- enced procedures to correct the problem or contact a Braun Corporation Product Support representative at 1-800-THE LIFT®.

Vehicle movement is prevented unless lift door is closed, ensuring the lift is stowed.

1.Verify lift stowed signal - pin 7 on the pump module has a +12 volt signal OR pin 9 has a ground signal (depends on interlock used).

2.Refer to the interlock installation instructions.

Lift operation shall be prevented unless the vehicle is stopped and vehicle movement is prevented.

1.Verify vehicle secure signal (pin 6) has a +12 volt signal.

2.Refer to the interlock installation instructions.

The platform will not fold/stow if occupied.

-Refer to Platform Fold Pressure Adjustment procedures.

The inner roll stop will not raise if occupied.

-Call Product Support

The outer barrier will not raise if occupied.

-Refer to Outer Barrier Fold Pressure Adjustment

Verify platform lighting when lift is deployed and pendant illumination when lift is powered.

1.Replace bulb(s) in the light housing.

2.Check fuse (5 amp fuse on circuit board; F13)

A visual and audible warning will activate if the threshold area is occupied when the platform is a least one inch below floor level.

1.Remove the threshold warning plate

2.Verify the threshold strip switch connectors are connected (see illustration on Page 3)

3.Replace the threshold strip switch

4.Reinstall the threshold warning plate

Platform movement is prohibited beyond the position where the inner roll stop is fully deployed (up).

-Call Product Support.

Lift platform movement shall be interrupted unless the outer barrier is deployed (up).

-Call Product Support.

Page 4

Image 6
Contents CA Warranty and Registration Instructions CongratulationsContents Lift Terminology PlatformSwitch and Sensor Locations Certification Checklist Diagnostic Procedures Platform Fold Pressure Adjustment Outer Barrier Fold Pressure AdjustmentPlatform Angle Adjustment Millennium NL SeriesCentury NCL Series Vista NVL Series Platform Stop Blocks Platform Floor Level Adjustment Bridging Microswitch Adjustment Bridging MicroswitchAdjustment Guidelines Troubleshooting Procedures LCD Lift CodesNon-Flashing Numbers Flashing NumbersLO Light Oil Maintenance and LubricationOuter Barrier DE Door-EaseMaintenance and Lubrication Schedule Cycles750 Cycles 1500 This page intentionally left blank Lift Electrical Schematic Lift Wiring Diagram UnfoldHydraulic Schematic Description SymbolHydraulics Parts List Hydraulic FluidHydraulics Diagram Pump Module Parts List Part Numbers of Items Dedicated per Lift ModelPump Module Diagram Pump Mounting BoltsFloor-to-Ground Lift Repair Parts List Part Numbers of Items Dedicated per Lift ModelPart Numbers of Items Identical on All Lift Models Floor-to-Ground Lift Exploded View 183ExplodedView NL916IB NL916FIB NL917IB NL917FIB NL919IB NL919FIB This page intentionally left blank Providing Access to the World CA