Impex MWB-345 manual See Diagram

Page 7

STEP 3 (SEE DIAGRAM 3)

A.) Attach the Leg Developer (#38) onto the bracket on the Front Stabilizer (#42). Secure it with an Allen Socket Axle (#44) and Allen Socket Screw (#45).

B.) Insert two Foam Roll Tubes (#39) halfway through the hole on the Leg Developer. Push

four Foam Rolls (#37) onto the Tube from both ends. Plug four Ø 1” Foam Roll End Caps (#36) onto each end of the Tubes.

C.) Clip a Spring Clip (#34) onto the post on the Leg Developer.

D.) Attach the Arm Curl Handle Support (#54) to the Leg Developer. Secure it with a Short Lock Pin (#8). Remove Pin when using the Leg Developer.

DIAGRAM 3

6

Image 7
Contents Marcy Before YOU Begin Table of ContentPrecautions Page Assembly Instruction Step See Diagram See Diagram Step See Diagram See Diagram Page Description Quantity Parts ListImpex INC