Impex MWB 716 manual Diagram

Page 8

STEP 4 (See Diagram 4)

A.) Attach the Leg Developer (#15) to the Front Stabilizer (#6). Secure it with one Axle (#19), two M10 x 5/8” Allen Bolts (#39), and two Ø ¾” Washers (#43).

B.) Insert one Foam Tube (#18) halfway through the hole on the Front Stabilizer. Insert two Foam Tubes halfway through the holes on the Leg Developer.

C.) Push six Foam Rolls (#22) onto the Foam Tubes from both ends. Plug six Foam Roll End Caps (#29) into the ends.

D.) Attach the Curl Bar (#16) to the bracket on the Leg Developer. Secure it with a 3” L- shaped Pin (#34). Attach an Olympic Sleeve (#32) onto the weight post on the Leg Developer. Attach a Spring Clip (#21) to the Sleeve. NOTE: When using the decline position to do Ab exercises, place at least 30 lbs of weights on the post to hold down the Leg Developer.

E.) When using Leg Developer, remove the Arm Curl Stand and the Curl Bar.

DIAGRAM 4

7

Image 8
Contents Marcy Olympic Bench Table of Contents Before YOU BeginImportant Safety Notice Hardware Pack Assembly Instruction DiagramDiagram Diagram Diagram Page Parts List KEY NO. DescriptionImpex INC