STEP-13 (See Diagram 13)
A.) Insert three Foam Tubes (#16) halfway through the holes on Leg Developer Holder (#2) and Leg Developer (#12).
B.) Push six Foam Rolls (#23) onto the Tubes from both ends.
C.) Push six Foam Roll End Caps (#72) into the ends.
D.) Attach the Arm Curl Handle (#19) to the bracket on the Leg Developer and secure it with a Lock Pin (#20). Remove the Arm Curl Handle when doing Leg Developer exercises.
DIAGRAM 13
24