STEP 9 (See Diagram 9 & Cable Loop Diagram)
A.) Attach one end of the 138” Sliding Weight Post Cable (#102) to the open bracket on the Sliding Weight Post (#14). Secure it with one M10 x 1” Allen Bolt (#68), two Ø ¾” Washers (#66), and one M10 Aircraft Nut (#86).
B.) Draw the Cable upward to the Pulley on the top of the Rear Upper Frame (#9) previously installed in
C.) Draw the Cable around the Pulley then downward. Install a Small Pulley (#103) to a Double Floating Pulley Bracket (#18).
D.) Draw the Cable around the Pulley then to the Triple Floating Pulley Bracket (#96) previously installed in
E.) Install a Small Pulley to the Bracket. Draw the Cable around the Small Pulley then downward to the open bracket on the Pulley Support Frame (#97).
F.) Install a Small Pulley to the bracket. Draw the Cable around the Small Pulley then upward. G.)Connect the Cable to a Short Chain (#63) with a
with one M10 x 1” Allen Bolt (#68), two Ø ¾” Washers (#66), and one M10 Aircraft Nut (#86).
H.) After completing the entire cable installations, come back to this Short Chain to adjust the tension of the Cable system by adjusting the length of the Chain.
I.) Install two Olympic Sleeves (#43) and Spring Clips (#60) onto the Sliding Weight Post (#14).
17