Impex PHC 2000 manual Diagram

Page 9

STEP 4 (See Diagram 4)

A.) Attach the Leg Developer (#11) to the Leg Developer Holder (#9). Secure it with an Axle (#36), two M10 x 5/8” Allen Bolts (#52) and two ¾” Washers (#56).

B.) Insert one Foam Tube (#24) halfway through the hole on the Leg Developer Holder. Insert two Foam Tubes halfway through the holes on the Leg Developer. Push six Foam Rolls (#30) onto the Tubes from both ends. Plug six Foam Roll End Caps (#38) into the ends.

C.) Slide an Olympic Sleeve (#34) onto the weight post on the Leg Developer. Attach a Spring Clip (#35) to the Sleeve.

DIAGRAM 4

8

Image 9
Contents Powerhouse Toll-Free Customer Service Number Mon. Fri a.m. 5 p.m. PST Important Safety Notice Hardware Pack Hardware Pack Diagram Diagram Diagram Diagram Diagram Page Parts List Impex INC