Impex PHC 715 manual Diagram

Page 7

STEP 3 (See Diagram 3)

A.) Insert the Leg Developer Holder (#9) into the top opening on the Front Stabilizer (#2). Secure it with a Lock Knob (#33).

B.) Attach the Leg Developer (#10) to the bracket on the Leg Developer Holder (#9). Secure it with an Axle (#18), two ¾” Washers (#43), and two M10 x 5/8” Allen Bolts (#40). Insert one Foam Roll Tube (#11) halfway through the hole on the Leg Developer Holder (#9). Insert two Foam Roll Tubes (#11) halfway through the holes on the Leg Developer (#10). Push six Foam Rolls (#27) onto the Tubes from both sides. Plug six Foam Roll End Caps (#26) into the ends.

C.) Slide the Olympic Sleeve (#15) onto the weight post on the Leg Developer (#10). Attach a Spring Clip (#32) onto the Olympic Sleeve. NOTE: When using the decline position to do Ab exercise, place at least 30lbs of weights on the post to hold down the Leg Developer.

DIAGRAM 3

6

Image 7
Contents Powerhouse Club Before YOU Begin Table of ContentsImportant Safety Notice Page Diagram Assembly InstructionDiagram Diagram Diagram Page KEY NO. Description Parts ListImpex INC