Impex WM-348 manual Diagram

Page 6

A.)

Connect the Front Stabilizer (#42) to the Main Seat Support (#52) and secure them with

 

two M10 x ¾” Hex Bolts (#46), four ¾” Washers (#3), and two M10 Aircraft Nuts (#4).

 

DO NOT tighten the nuts and bolts yet.

B.)

Connect the Main Seat Support (#52) to the open bracket on the Cross Brace (#59).

 

Secure the rear hole on the bracket with one M10 x 2 3/8” Bolt (#2), two ¾” Washers

 

(#3), and one M10 Aircraft Nut (#4). Secure the other hole with a 3” Lock Pin (#58).

 

Note: DO NOT over tighten the nut and bolt. The Main Frame needs to pivot on this

 

bolt in able to fold up the bench.

C.)

Connect one end of Diagonal Support (#43) to the Main Seat Support (#52). Secure it

 

with one M8 x 2 1/8” Hex Bolt (#48), two 5/8” Washers (#21) and one M8 Aircraft Nut

 

(#49). Connect the other end to the Front Stabilizer. Secure it with one M8 x 5/8” Hex

 

Bolt (#20) and 5/8” Washer (#21).

D.)

Securely tighten all the nuts and bolts previously installed.

E.)

Insert 6 ½” Long Lock Pin (#53) into the hole on the Main Seat Support (52). NOTE:

 

The Pin is not designed to sustain any heavy weight. Only use the pin when changing

 

the backrest board to a vertical position when doing Walk-in-Squat from the rear.

 

DIAGRAM 2

5

STEP 3 (SEE DIAGRAM 3)

Image 6
Contents Powerhouse Table of Content Before YOU BeginImportant Safety Notice PrecautionsPage Assembly Instruction Diagram See DiagramDiagram Same step to install the other side #10 Diagram Diagram Parts List Description Quantity Impex INC