STEP 10 (See Cable Loop Diagram & Diagram 10)
A.) | Insert the 110.2” Lower Cable (#30) through the opening on bottom of the Leg |
| Developer (#11). Attach a Pulley (#28) to the opening. Secure it with one M10 x |
| 2 3/8” Allen Bolt (#46), two ∅ 7/8” Pulley Bushings (#51), and one M10 Aircraft |
| Nut (#55). |
B.) | Draw the Cable underneath the Pulley and through the opening on the bottom of |
| the Main Seat Support to the open bracket on the Main Base Frame (#6). |
C.) | Attach a Pulley to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#45), |
| two ∅ ¾” Washers (#53), and one M10 Aircraft Nut (#55). |
D.) | Pull the Cable towards the back of the machine through the bottom opening on |
| the Front Lower Vertical Beam (#82) to the open bracket on the Main Base |
| Frame (#6). Repeat the Procedure C to install a Pulley. |
E.) | Draw the Cable underneath the Pulley then upward to the Double Floating Pulley |
| Bracket (#19) previously installed. Repeat the Procedure C to install a Pulley to |
| the open bracket. |
F.) | Draw the Cable around the Pulley then downward to the last open bracket on the |
| Main Base Frame. Repeat the Procedure C to install a Pulley. |
G.) | Draw the Cable underneath the Pulley then pull upward to the Single Floating |
| Pulley Bracket (#18) previously installed. Connect the Cable to the Short Chain |
| (#58) with a |
| Allen Bolt (#75), two ∅ 3/4” Washers (#53) and one M10 Aircraft Nut (#55). |
H.) | Adjust the length of the Short Chain to adjust the tension of the Cables. If there |
| is too much sag in the cables, shorten the Chain. |
15