Jumpking YJ manual D

Page 18

10.Attach the other three Pole(16,17) in the same way. See inset drawing.

11.Lay out Top G3 Pole (18), joint each section Connector to a straight line as shown.

Assemble the remaining Top G3 Pole (18) in the same way.

Spread the Netting (20) on the trampoline bed, insert a Top G3 Pole (18) into the opening of Top Sleeve on the Netting (20). Insert the other Top G3 Pole (18) into the opposite opening of Top Sleeve on the Netting (20).

12.Joint each end of Top G3 Pole (18) by the clip of connector at each opening. The Top Sleeve of the Netting (20) become a round shape.

10









D



2SHQLQJ



1HWWLQJ 



,QVHUWWKHSROHLQWRVOHHYHRIWKH1HWWLQJ 



-RLQWWKHHQGRIHDFKSROHE\&OLSRI&RQQHFWRU





 6WDUW

)LQLVK

7RS6OHHYH

'RRURI1HWWLQJ

19

Image 18
Contents YJ USA Corp., 3970 Lindbergh Drive Adison, TX Page Trained Spotter supervision is recommended Page Page Page Page Page Page Sharply Spot Page Page Page Marking Hook the V-ring ODVWLF7LHRZQ 6RFNHW D Page 6WDNH Wedge