Huffy ANAS350 manual Wood Scrap

Page 7

ELEVATOR INSTALLATION (See steps 9-22)

10.

7.

1

9.

8.

8

 

7

IMPORTANT!

9

 

(See Text Page)

11

 

 

8

 

10

5

WOOD SCRAP

•Chute de Planche

12

13

11.

12

12.

 

 

12

 

 

 

 

 

 

15

14

Note

 

 

 

(See Text Page)

 

 

 

10

 

18

 

 

 

 

 

10

 

 

WARNING

 

 

 

7

 

 

 

(See Text Page)

 

16

 

 

 

9

 

 

 

8

 

 

12

 

 

16

 

 

 

 

 

 

 

12

 

 

 

 

 

17

 

 

 

17

 

 

 

13.

 

14.

WARNING

 

 

(See Text Page)

 

 

 

 

 

21

 

 

15.

22

 

 

19

 

 

 

 

 

 

 

22

 

 

9

 

 

 

 

 

Note

 

 

 

 

(See Text Page)

21

 

 

 

 

 

 

 

 

23

7

05/03 P/N 214969B

Image 7
Contents Write in Your Height AdjustmentRequired Tools Materials ¡ANTES DE Comenzar Avant DE CommencerVorbereitende Massnahmen 05/03 P/N 214969B See Hardware Identifier Item Qty.Part No. Description Parts ListHardware Identifier Middle TOPBottom Wood Scrap Fig. a Reinforcement BAR Playing Surface For spring loaded rim 10 ft 05 m Clip ARM Clip Body NET Installation Numéro DE Modèle Outils Necessaires ’INSTALLATIONFrançais Carte DE Garantie Transport DES Systems ZUR Installation Erforderliche WerkzeugeHinweis AN DAS Montagepersonal Notieren SIE Sich Ihre Modell NummerDeutsch Garantiekarte Movimiento DEL Sistema Aviso Para LAS Personas QUE VAN a Montar EL SistemaEscriba SU Número DE Modelo Herramientas Necesarias Para LA InstalaciónEspañol Tarjeta DE Garantía