7. Attach board assembly to pole with carriage bolts (16) and knobs (11) as shown. Install pole cap (7) as shown.
16
11
11
7
16
Place assembled unit in desired location. Fill tank completely with water (14 gallons/53
8. liters) or sand (approx. 170 lb./77 kg) and snap tank cap (9) in place.
CAUTION!
ADD ONE GALLONS (3.78 LITERS) OF
9
P/N 21473501 12/04 | 12 |
http://www.huffysports.com