1.Remove contents from tank
1
2.Install rod (5) through holes in bottom pole section (4) and eyebolt (6).
6
4
4 |
5 |
5
6
P/N 211988B 03/03 | 8 |
1.Remove contents from tank
1
2.Install rod (5) through holes in bottom pole section (4) and eyebolt (6).
6
4
4 |
5 |
5
6
P/N 211988B 03/03 | 8 |