A SS E M B LY
I N S T R U C T I O N S
Step 2c
F R A M E A S S E M B L Y
In this step, start by pressing (CB) and (CA) into (12), insuring (CB) is pressed in the same side as (14) is mounted to (13). Place (9) over the two holes in the bottom of (1). Now slide (9) into the holes. Slide (11) and (12) onto (9). Make sure (12), (11), and (9) are sitting level, then fasten the top of each (9) to (1). Next attach (14) to (13). Secure (13) to (12), slide on (16) and attach another (14) to (1). Attach bigger end of the (CC) to (13), and the other end to (17). Then Wrench tighten bolts.
Part Descriptions | Hardware Descriptions | |
1 - Frame Assembly | C - | |
9 - Guide Rod | D - | |
10 | - Weight Bumper | E - |
11 | - 20 LB. Intermediate Weight | F - |
12 | - 8.6 LB Aluminum Weight | AC - 3/8” Split Washer |
13 | - Center RH (BRK) Assembly | AD - 3/8” Flat Washer |
14 | - Add on Rod | AE - 5/16” Lock Washer |
15 | - Cable Pulley Weight Mount Assembly | AF - 5/16” Flat Washer |
16 | - 5 LB Cast Add on Weight | AG - 3/8” Flat Washer |
17 | - Weight Selector Pin | AH - 3/8” Lock Washer |
|
| AJ - 3/8” Lock Washer |
AK - 5/8” Nylon Washer
BB - Serrated Hex Nut
CA - Guide Bearing (Short)
CB - Guide Bearing (Tall)
CC - Selector Pin Lanyard
Page 9
HOIST
FITNESS SYSTEMS
R