Impex MWB 214 manual Diagram

Page 8

STEP 3 (See Diagram 3)

A.) Attach the Leg Developer (#6) to the open bracket on the Front Support (#5). Secure it with one M10 x 2 3/8” Hex Bolt (#21), one Ø ¾” Washer (#31), and one M10 Aircraft Nut (#27).

B.) Insert two Foam Tubes (#13) half way through the holes on the Leg Developer. C.) Push four Foam Rolls (#12) onto the Foam Tubes.

D.) Attach the Arm Curl Pad (#16) to the Arm Curl Stand (#17). Secure it with two M8 x ¾” Hex Bolts (#37) and two Ø 5/8” Washers (#26).

E.) Insert the Arm Curl Stand into the opening on Front Post and use the Lock Knob (#39) to obtain desired height for Arm Curl exercise.

DIAGRAM 3

7

Image 8
Contents Marcy Weight Bench Toll-Free Customer Service Number Mon. Fri a.m. 5 p.m. PST Important Safety Notice Wraning Label Placement Hardware Pack Assembly Instruction Tighten the Nut and Bolt until instructed to do so Securely tighten all Nuts and BoltsDiagram Diagram Page Parts List ’tyImpex INC Info@impex-fitness.com